13.3.8.2 Sanitary drainage - I have a combined sewer?

Started by , Dec 23 2013 04:37 PM
6 Replies

Happy Holidays folks,

I'm preparing for my first SQF Level 2 in a few months and need some help closing gaps.

 

13.3.8.2 says "Sanitary drainage shall not be connected to any other drains within the premises and shall be directed to a septic tank or a sewerage system.". 

 

Problem is that my town utilizes a combined sewer system.  Therefore, at some point all my drains (floor, toilet, sinks) connect and leave the building. 

 

We have backflow preventers that are tested annually, but I don't think this will get me past this requirement.  Any ideas on how I can meet this requirement?  I can't tear up the floor and re-plumb >100,000sqft manufacturing plant.  There are many other food facilities in my town (Rochester, NY, USA) using the same combined sewer system (although they may not be SQF), so there must be a way around this.

 

Share this Topic
Topics you might be interested in
Sanitary condition How to handle the following FDA observation: Your plant was not constructed to facilitate maintenance and sanitary operations Food Safety with Hygienically Constructed Equipment Built to Sanitary Design Food Safety with Hygienically Constructed Equipment Built to Sanitary Design Food Safety with Hygienically Constructed Equipment Built to Sanitary Design
[Ad]

You have posted this in the SQF packaging forum, can you tell us what products you manufacture and if/how you use water in your process.

 

Thanks.

Happy Holidays folks,

I'm preparing for my first SQF Level 2 in a few months and need some help closing gaps.

 

13.3.8.2 says "Sanitary drainage shall not be connected to any other drains within the premises and shall be directed to a septic tank or a sewerage system.". 

 

Problem is that my town utilizes a combined sewer system.  Therefore, at some point all my drains (floor, toilet, sinks) connect and leave the building. 

 

We have backflow preventers that are tested annually, but I don't think this will get me past this requirement.  Any ideas on how I can meet this requirement?  I can't tear up the floor and re-plumb >100,000sqft manufacturing plant.  There are many other food facilities in my town (Rochester, NY, USA) using the same combined sewer system (although they may not be SQF), so there must be a way around this.

 

Hi Zac,

 

You should control the drainage within your facility and ensure 'sanitary drainage is kept separate from drainage from food production areas' and that there are no 'back ups'

13.3.8.2 also states procedures shall be documented and implemented to properly manage sewage back-ups in order to minimize the potential for contamination.

 

In a lot of facilities sewage will eventually combine into a main sewer. The most important thing is that sanitary sewage does not flow through drainage in product areas. Sanitary sewage and drainage from product areas if they combine at some stage should be well downstream of the product areas.

 

Regards,

 

Tony

Thanks for the input guys.  I think I will be OK if the auditor understands the difference as you've explained it.  Sewage does not flow through my manufacturing area, but the pipes to connect at the main sewer pipe in the building that then discharges into city combined sewer. 

 

There is a risk of back up if there was an internal block at just the right spot. Should I create an SOP on how to respond to such an event?  My crew know (through other documented training) that if there is even potential contamination that material is to be controlled as nonconforming.  If there was a sewer backup that affected product or raw materials I'm confident they would take correct actions. 

 

I just hate to have a procedure for every possible (and unlikely) event.  Per customer request we just wrote a similar procedure for water ingress from a roof leak.  Now we could have sewer back up procedure.  What's next; the sky is falling?  For significant risks I could see this (ex: glass breakage), but I've never once in all the years had a sewage backup at our plant.

1 Thank

Since you are going for SQF certification, why not write the the procedure to be followed directly into your BCP - it could even be your test/verification/training process for the annual requirement of the BCP.  Interestingly enough I saw the "most unlikely event" happen in a plant real time while doing an audit one day and it was a sewer back up from the main line.

Thanks for the input guys.  I think I will be OK if the auditor understands the difference as you've explained it.  Sewage does not flow through my manufacturing area, but the pipes to connect at the main sewer pipe in the building that then discharges into city combined sewer. 

 

There is a risk of back up if there was an internal block at just the right spot. Should I create an SOP on how to respond to such an event?  My crew know (through other documented training) that if there is even potential contamination that material is to be controlled as nonconforming.  If there was a sewer backup that affected product or raw materials I'm confident they would take correct actions. 

 

I just hate to have a procedure for every possible (and unlikely) event.  Per customer request we just wrote a similar procedure for water ingress from a roof leak.  Now we could have sewer back up procedure.  What's next; the sky is falling?  For significant risks I could see this (ex: glass breakage), but I've never once in all the years had a sewage backup at our plant.

Zac, we have similar non-conformance at our recent SQF audit. I was wondering was the sewer back up procedure acceptable and sufficient as a corrective action. Thank you

You have posted this in the SQF packaging forum, can you tell us what products you manufacture and if/how you use water in your process.

 

Thanks.

Food and pharma flexible packaging.  We do not use much water, and it is not a direct raw material.  We use water with soap when we mop the floors or run our floor scrubber.  We add water to adjust viscosity of waterbased inks.  Hand washing. That's about it.

 

 

Zac, we have similar non-conformance at our recent SQF audit. I was wondering was the sewer back up procedure acceptable and sufficient as a corrective action. Thank you

 

My auditor didn't dig too deep on this one.  He reviewed our procedure which mentions how our drainage works, how test backflow preventers, and how we train employees to identify and respond to any water/flood/sewage backup issues.  After reviewing the procedure he ticked a few boxes and moved on.  I have backflow test records on file, and training records on file, and even blueprints showing the drainage plumbing, but we didn't get into those.

2 Thanks

Similar Discussion Topics
Sanitary condition How to handle the following FDA observation: Your plant was not constructed to facilitate maintenance and sanitary operations Food Safety with Hygienically Constructed Equipment Built to Sanitary Design Food Safety with Hygienically Constructed Equipment Built to Sanitary Design Food Safety with Hygienically Constructed Equipment Built to Sanitary Design SQF 11.2.5.7 - Sanitary Facilities and Employee Amenities in Pre-Operational Inspection Do we need to document daily sanitary checks? Meeting SQF 11.3.9 Requirements - Sanitary Facilities Sanitary Design Ideas - Permanent Guides on a Plastic Table Sanitary Drying Methods-Ribbon Blender