Verification Plan (7.8)
I am a newcomer in this forum. I would like to know if it's possible doesn't make a general verification plan (7.8) if part of this information is already included at the end of each document (Plan HACCP, PRP and OPRP ) in form of efficacy verification. For example, in case of water quality control, as evidence of verification, would be enough with the report of several microbiological analysis signed by a member of the food safety team? each document specifies who, when, and how the efficacy is measured
Thanks and regards
I am a newcomer in this forum. I would like to know if it's possible doesn't make a general verification plan (7.8) if part of this information is already included at the end of each document (Plan HACCP, PRP and OPRP ) in form of efficacy verification. For example, in case of water quality control, as evidence of verification, would be enough with the report of several microbiological analysis signed by a member of the food safety team? each document specifies who, when, and how the efficacy is measured
Thanks and regards
Hi FerranFlo,
:welcome:
If you already verify Procedures, PRPs, OPRPs & HACCP Plans then there is no need to duplicate but I would draw up a summary document/table of your verification activities. This will make it clear to everyone (including your auditor) how you are complying with clause 7.8.
Regards,
Tony
thank you so much for your answer
regards
Ferran
Hi
I'm a new member, i working in seafood factory, i dontn know 7.8 and 8.2 ISO 22000. Help me, if possible you can send example foe me. Thanks
Hi
I'm a new member, i working in seafood factory, i dontn know 7.8 and 8.2 ISO 22000. Help me, if possible you can send example foe me. Thanks
Hi Kahnhgm,
:welcome:
Clause 7.8 Verification planning
An example would be verification based on testing of end products, you have a sample plan that checks the level of hazard which is being controlled and results confirm the hazard is absent or at an acceptable level.
Clause 8.2 Validation of control measure combinations
This is not the same as verification, quoting from ISO 22004:
Validation is an assessment prior to operation, the role of which is to demonstrate that individual (or a combination of) control measures are capable of achieving the intended level of control.
Verification is an assessment carried out during and after the operation, the role of which is to demonstrate that the intended level of control has actually been achieved.
The validation usually includes such activities as
a) reference to validations carried out by others, to scientific literature, or to historical knowledge,
b) experimental trials to simulate process conditions,
c) biological, chemical and physical hazard data collected during normal operating conditions,
d) statistically designed surveys,
e) mathematical modelling, and
f) use of a guide approved by competent authorities.
Regards,
Tony
Thanks Tony
Hi Kahnhgm,
:welcome:
Clause 7.8 Verification planning
An example would be verification based on testing of end products, you have a sample plan that checks the level of hazard which is being controlled and results confirm the hazard is absent or at an acceptable level.
Clause 8.2 Validation of control measure combinations
This is not the same as verification, quoting from ISO 22004:
Validation is an assessment prior to operation, the role of which is to demonstrate that individual (or a combination of) control measures are capable of achieving the intended level of control.
Verification is an assessment carried out during and after the operation, the role of which is to demonstrate that the intended level of control has actually been achieved.The validation usually includes such activities as
a) reference to validations carried out by others, to scientific literature, or to historical knowledge,
b) experimental trials to simulate process conditions,
c) biological, chemical and physical hazard data collected during normal operating conditions,
d) statistically designed surveys,
e) mathematical modelling, and
f) use of a guide approved by competent authorities.
Regards,
Tony
Dear Tony,
Could you please give me table of what to do to fulfill Verification plan in ISO 22000?
Thanks and best regards
Dear Akool18,
You can refer to this attached file. It is too general example of verification activities.
Hope it will you.
Attached Files
Dear Akool18,
You can refer to this attached file. It is too general example of verification activities.
Hope it will you.
Thank you so much for your help Ati.