What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Update of reviewed policies, if no changes

Started by , Dec 06 2016 12:58 AM
7 Replies

Hi. This may have been covered in other posts, but can anyone guide me on what I could do if a policy is reviewed and it has no changes from the review. Our policies have last review date and next review date. Should I update the policy to a new version just to change the dates?

Thanks

Share this Topic
Topics you might be interested in
Nutrition Information Update on the Label If there are no changes in SOPs and Policies, do we need to update the review date if it is more than three years? Withdrawal of FSSC 22000 certification do we need to update the manual to V 5.1? Update Numbering for SQF 9.0 SQF Edition 9 Update
[Ad]

Maybe you can revise the format to remove the next review date.

In my previous company, the company's policy only have the review date and the policy is reviewed every year according to plan and even there is no change, the date must be updated.

1 Thank

Hi. This may have been covered in other posts, but can anyone guide me on what I could do if a policy is reviewed and it has no changes from the review. Our policies have last review date and next review date. Should I update the policy to a new version just to change the dates?

Thanks

 

Hi RosieMolly,

 

Any particular FS standard involved ?

Hi Charles,

BRC....and ISO9001

Hi Charles,

BRC....and ISO9001

 

These 2 are rather different kettes of food, prescriptive vs generic.

 

Was either of them "more" related to yr query ?

addendum

 

Never mind. i am not a ISO user anyway. :smile:

1 Thank

Hi RosieMolly,

 

Assuming yr definition of a new "revision number" implies a change in "content" then the logical answer IMO to yr query is NO. But also see the final paragraph below and the PPS.

 

Questions about  ISO9001 "review" are one of the numerous  ISO "old chestnuts".

 

I agree with Post 2.

 

I looked through my archives and extracted a few ISO9001 snippets to support not showing a specific next review date (NRD) while still answering the iso standard's requirement. These are attached below.

 

Options.pdf   10.28KB   24 downloads

 

I suggest the same response for BRC unless NRD is specifically required to be shown on the document which afaik it isn't.

 

A third variation again based on not showing NRD  is suggested in link below. Seemed quite practical to me -

 

http://www.qualitysy...w-your-policies.

 

If you really must show the NRD maybe create an exception within yr main document control procedure for this specific case stating (something like) -  the version number will remain unchanged for successive NRDs provided that the documented result of an assessment of necessity for a revision of the relevant document (as implemented according to SOP Document Revision XYZ)  is negative, ie no revision  required.

(this is vaguely analogous to the well-accepted manouevre of defining a document revision number to not need changing if only edit for minor typographical errors)

The counter-argument to above manipulations is that will eventually have 2 documents with same name/revision number but which are not absolutely 100% identical..The above bracketed divergence is unquestionably validatable in various published ISO document control examples but whether one can argue that a change in a header or footer info. is equally  "minor" is perhaps more debatable. Hence the preference to simply not show a NRD (unless a specific validation reference is locatable somewhere).

 

PS - there is some discussion on this topic in thread below although not specifically directed to yr OP -

 

http://www.ifsqn.com...anual-policies/

 

PPS - Assuming you have a Master List of Documents (?) here is another alternative which would only involve updating the revision number on One document and theoretically only one time if all docs are reviewed on a fixed date -

 

As per ISO 9001 you do not have to review your procedures once a year. However you must check your own procedures, especially your own Document Control procedure, to see if you have impose on yourself to do this. Perhaps not your Document Control procedure but the Master List of Documents may also contain a column titled “next review” which may tell you when is the next required review date for your procedures, forms or documents. Or you may also check your Quality Manual, you never know but there may be things you signed up to do and therefore you must do those.

http://mireauxms.com...ew-do-i-have-to

2 Thanks

For policy, we only have the date but for SOP, there are revise date and revision no.

1 Thank

Similar Discussion Topics
Nutrition Information Update on the Label If there are no changes in SOPs and Policies, do we need to update the review date if it is more than three years? Withdrawal of FSSC 22000 certification do we need to update the manual to V 5.1? Update Numbering for SQF 9.0 SQF Edition 9 Update SQF Edition 9 Update Trying to access PWC/SSAFE Vulnerability Tool to update our Food Fraud Vulnerability Assessment Metal Detector and CCP transferred to a different facility, do we need to update HACCP Plan? The Influence of COVID-19 on the Food Industry. An IFSQN update and Q & A session. The Influence of COVID-19 on the Food Industry. An IFSQN update and Q & A session.