Point 6. Planning ISO22000:2018
Started by natalylissettte, Oct 07 2020 02:03 PM
Hi!!! Does anybody have an example of how to correctly implement point 6. planning of ISO 22000. Specifically 6.1 Actions to address risks and opportunities, Thank you
Questions used to determine the critical control point
ISO 8573-1 Compliance-Point of Use
Point of use 0.01 micron compressed air filters
BRCGS V9 point 3.9.3
BRCGS Point 4.5.3, Compressed Air
[Ad]
Hi!!!They have an example of how to correctly implement point 6. planning of ISO 22000. Specifically6.1 Actions to address risks and opportunitiesThank you
Hi nataly,
I guess you mean that you are looking for an example.
Hi!
Yes, i'm looking for an example
To answer this I believe it need to start from Clause 4.1 context of the organization and 4.2 understanding the needs and expectations of interested parties. Here some will be related to internal issues and some will be related to external issues. One of the method is by SWOT analysis. Weakness and Threat will be considered as risk and that need to be addressed by action plan(clause 6.1). Here we set up objectives (clause 6.2) so that the action plan can be full filled so that Weekness and Threat will be mitigated.
Strength and Opportunity will be considered as opportunity that need to assessed for any further action(if required) (clause 6.1).
Strength and Opportunity will be considered as opportunity that need to assessed for any further action(if required) (clause 6.1).
1 Thank
Questions used to determine the critical control point
ISO 8573-1 Compliance-Point of Use
Point of use 0.01 micron compressed air filters
BRCGS V9 point 3.9.3
BRCGS Point 4.5.3, Compressed Air
Record keeping for Control Point - not a CCP
Is a sterile terminal filter at the point of compressed air entry a CCP?
At what point is a foreign material contamination so small it is not a contamination?
Breaking point as Quality Assurance
Remove Product Recall Risks, One Critical Control Point at a Time