What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

HACCP plan for Water filter manufacuring

Started by , Nov 21 2022 10:33 AM
5 Replies

Hello,

 

Could you help me to share a HACCP plan or any useful data for Water filter manufacturing

 

the processes is assembly the component:

1. receiving the component from the store

2. getting the competent from its boxes and send to second process

3. assembly the component and fit it well

4. installation of electrical and mechanical parts

5. leakage testing and testing the performance of the unit

6. final test and packaging

7. add to the final product warehouse

 

I appreciate your help with a HACCP plan or an idea how to do by myself

 

Regards

Share this Topic
Topics you might be interested in
HACCP certification for SQG Ed 9.0 - System Element 2.1.1.5 HACCP Training for Flexible Packaging Industry No CCPs in a HACCP Plan - Can This Be Possible? Should you list your preventative controls on your HACCP process flow chart? Fair Price to charge for developing 2 HACCP plans
[Ad]

Greetings,

 

The things you need to test for in your process is microbiological output in a sample of finished product/s, meaning collect the water from step 5 or 6 and have it tested. Also, you could check in your analysis the risk of material migration and maybe the integrity of the product for physical dangers (parts that could break easily and get in the consumer's drinking water - its not really possible, but you will see it through your hazard analysis).

Also, extra materials used, if they need to be food grade, like some lubricant on some parts if used, some rubbers.

Chemical dangers could include cleaning agents residues if you use any for disinfection in the assembly line.

 

Regards!

Hello,

 

Could you help me to share a HACCP plan or any useful data for Water filter manufacturing

 

the processes is assembly the component:

1. receiving the component from the store

2. getting the competent from its boxes and send to second process

3. assembly the component and fit it well

4. installation of electrical and mechanical parts

5. leakage testing and testing the performance of the unit

6. final test and packaging

7. add to the final product warehouse

 

I appreciate your help with a HACCP plan or an idea how to do by myself

 

Regards

Hi sunrize,

 

I presume this is for iso22000 or fssc22000 since otherwise HACCP/Manufacturing Process IIRC is mostly for Food-Drink/Food-Drink Packaging ?

 

If so you will need to comply with relevant Standards.

Hi sunrize,

 

I presume this is for iso22000 or fssc22000 since otherwise HACCP/Manufacturing Process IIRC is mostly for Food-Drink/Food-Drink Packaging ?

 

If so you will need to comply with relevant Standards.

Hello,

 

Yes it is local regulation that require this factory to have a HACCP plan 

i found that there is no CCP in these processes ? is i am correct in this ?

i found that there is no CCP in these processes ? is i am correct in this ?

Hi sunrize,

 

You did not specifically reply to Post 3 so I now assume "Local Regulation" is referring to manufacture of drinking water (ie not manufacture of filter).

 

Accordingly answer to Post 5 likely depends on yr Water Process and perhaps the Haccp Standard involved, eg see the example in this Post -

 

https://www.ifsqn.co...ram/#entry47723


Similar Discussion Topics
HACCP certification for SQG Ed 9.0 - System Element 2.1.1.5 HACCP Training for Flexible Packaging Industry No CCPs in a HACCP Plan - Can This Be Possible? Should you list your preventative controls on your HACCP process flow chart? Fair Price to charge for developing 2 HACCP plans HACCP plan for chocolate and risk area decision tree HACCP Flow charts and 'confidentiality' Implementing HACCP/BRC for a Logistics Company Is HACCP broken? How would I verify my HACCP Plan for new product?