ISO 22000, 8.2 Validation of control measure combinations
Hi Folks,
on the clause 8.2 Validation of control measure combinations, are we need to validate all control measures (PRP, OPRP & CCP)? Are is only specific control measures validation is enough (OPRP & CCP)?
I'm asking because, most of industries validation only OPRP and CCP's with plan. Am I get NC in audit if I do the same as per 8.2?
Hi Folks,
on the clause 8.2 Validation of control measure combinations, are we need to validate all control measures (PRP, OPRP & CCP)? Are is only specific control measures validation is enough (OPRP & CCP)?
I'm asking because, most of industries validation only OPRP and CCP's with plan. Am I get NC in audit if I do the same as per 8.2?
Hi Mohan,
You only need to Verify PRPs as per iso22000-2005.
For oprps/ccps see clause 8.2. = Yes.