What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Has anyone done a verbatim on SQF to their procedures?

Started by , Nov 13 2020 04:31 PM
9 Replies

Working on new edition of SQF and wondering if anyone has done verbatim from SQF Code to their procedures. Of course, having the supporting associated documents.

Share this Topic
Topics you might be interested in
Transportation Procedures Food Security Policies and Procedures External Cleaning Contractor Procedures and Records Changeover and documentation procedures requirements Procedures for the safe, legal disposal or return of obsolete or out-of-date chemicals and empty chemical containerstainers
[Ad]

My first SQF audit was last year and our auditor recommended that in the future I just copy the code verbatim.  I did that for this year, but have not yet had my audit.

2 Likes1 Thank

what does that mean?

My first SQF audit was last year and our auditor recommended that in the future I just copy the code verbatim.  I did that for this year, but have not yet had my audit.

Thats great to know. I will be doing it for my next audit on 9.0. Thanks!

what does that mean?

Basically, taking the SQF code word for word to use as our procedures.

Basically, taking the SQF code word for word to use as our procedures.

Also sometimes known as reverse engineering. :smile:

 

However zero text adjustment is likely to cause verbal tensing errors/illogicalities.

1 Thank

Your FSMS and all procedures should be specific to your facility. I would caution against verbatim procedures. Code tends to refer to requirements, not specific actions which you would need in procedure. For instance SQF code states: "2.4.3.5 Product descriptions shall be developed and documented for all packaging included in the scope of the
food safety plans. This shall reference the finished product specifications (refer to 2.3.5.1) plus any additional information relevant to product safety, such as WVTR, gas permeability.
" That isn't a procedure, it's a description of the content of your procedure. The procedure should describe the steps for HOW you comply with the code specific to your products and processes. Document control is another one. Your specific activities related to document control might be keeping files of controlled paper copies in locked file cabinets where mine is electronic documents controlled by access to modifications given only to the sys. admin. and myself. The procedure will refer to the specific method.

1 Thank

Basically, taking the SQF code word for word to use as our procedures.

 

Thanks for letting me know.

 

I would not suggest that at all, regardless of what an Auditor might recommend - and frankly, that Auditor should get reported.

 

We've actually written a lot of systems and do not do verbatim's (as you have called it) - all are custom within a framework.

 

I would be highly suspect as an Auditor ( and I was one of the first SQF Auditors) if I saw a high percentage of cut and paste interwoven.

2 Likes1 Thank

We have been audited by an SQF Certification Body for many years and we have used the wording from the various versions of the code verbatim in many instances, but not solely.  For some of your programs you will need to expand on how you will meet the requirements in your facility; especially if the code wording says "the methods and responsibility ... shall be documented and implemented". You will need to define your facilities specific methods and who all will be responsible by job titles.  However for sections of the SQF Code such as Ed 9, 2.1.2, Management Review, I think it would be very practical and efficient to use their wording so there is no doubt you will meet the SQF Requirements.

2 Likes2 Thanks

We have been audited by an SQF Certification Body for many years and we have used the wording from the various versions of the code verbatim in many instances, but not solely.  For some of your programs you will need to expand on how you will meet the requirements in your facility; especially if the code wording says "the methods and responsibility ... shall be documented and implemented". You will need to define your facilities specific methods and who all will be responsible by job titles.  However for sections of the SQF Code such as Ed 9, 2.1.2, Management Review, I think it would be very practical and efficient to use their wording so there is no doubt you will meet the SQF Requirements.

I think 2.1.2 is the exact criteria that was being reviewed when my auditor suggested I use the verbiage in the code.  The approach you've described is the same one I've taken.

1 Like

Similar Discussion Topics
Transportation Procedures Food Security Policies and Procedures External Cleaning Contractor Procedures and Records Changeover and documentation procedures requirements Procedures for the safe, legal disposal or return of obsolete or out-of-date chemicals and empty chemical containerstainers Cleaning Procedures in Coffee Manufacturing and Packaging Example HACCP Manual and Procedures for Packaging Company Chiller and Freezer Breakdown Procedures Revisions on SQF Procedures Emergency preparedness and response procedures as required by ISO 22000 for food packaging