Inspector suggests cooling of pre cooked filling is a CCP

Started by , Oct 22 2015 08:50 PM
3 Replies
As a stage of the production of meat pies the filling is prepared and cooked a day in advance, then cooled and stored under refrigeration. Preformed and chilled uncooked pastry cases are then filled with the cooked filling before being cooked again achieving a core temperature of over 90 degrees for the filling. These elements of processing are described and controlled within the prerequisite programmes.

The pies are then sold as a freshly cooked product.

An inspector has suggested that the cooling of the meat filling must be identified as a CCP within the HACCP.

It would be valuable to hear the views of colleagues.
Share this Topic
Topics you might be interested in
Retail food inspector over-reaching into manufacturing USDA Inspector too lenient USDA Inspector Issues USDA Inspector refuses to comply with our procedures Can you stage product in the production room while Pre-Op is going on with a USDA inspector present?
[Ad]

Rob Marriner,

 

Your inspector is correct, cooling should be a CCP.  The purpose being, to assure that the meat product cools down to the temperature required in the time required by the regulations.  I would add that having the cooking process as a CCP would also be smart.

 

For the USDA, the cooking CCP would require the product to reach 165 degrees F or above for a specific amount of time (ex: 30 seconds-1 min).  The cooling CCP would consist of 2 temperature readings.  1) 165 F+ to 80 F in 2 hours (approximate), and 2) 80 F to 40 F in 5 hours (approximate).  With these 2 CCPs, the entire process from batching to cooler/freezer is covered.

 

Check your local regulations to see what the time and temperature requirements are.

1 Like3 Thanks

Hi Rob,

 

One of the typical suspects -

 

https://en.wikipedia...ium_perfringens

1 Thank

I agree. Some years ago I was QM for a cook-chill company making soups, sauces and rice pudding. After filling, we put the product in our blast chiller with CCPs of 2hrs to can't remember and 4hrs to below 5 Deg C. After that the product was moved to the chilled store for distribution. We were SALSA, not BRC.


Similar Discussion Topics
Retail food inspector over-reaching into manufacturing USDA Inspector too lenient USDA Inspector Issues USDA Inspector refuses to comply with our procedures Can you stage product in the production room while Pre-Op is going on with a USDA inspector present? Can an USDA inspector tag product without knowing the regulation? Has anyone ever requested a change to their USDA FSIS inspector? Is an USDA Inspector allowed to take photos of our HACCP book? Inspector is over zealous and condescending What does an USDA inspector do at a catfish processing plant?