PMS and Calibration Template for HACCP Plan

Started by , Jul 30 2021 05:55 AM
4 Replies

Hi everyone, I am practically new here. Our company is now on the process of creating an FSMS applying all HACCP and GMP plans. I am a representative of the Engineering department. Our task is to provide plans on PMS of machine (preventive and breakdown) and calibration (weighing scales and temperature). The machines intended are for food grade quality specifically in plastic production. Can anyone please enlighten me on how to make the document? I already have ideas on weighing scale calibrations, temperature monitoring devices calibrations but don't know how to actually put it in a document. Any help will be very much appreciated. Thank you! Regards, Jayson

Share this Topic
Topics you might be interested in
HACCP plan for cold smoked trout needed Food safety culture plan fssc22000 v6 HACCP Meeting checklist HACCP plan for chocolate and risk area decision tree HACCP Plan for Frozen Meat
[Ad]

Welcome to the forum :welcome:

 

I feel that this is one of those areas that is easy to overthink, and thus over-complicate ;)

A basic table listing the item, the frequency, the required tolerance, due date, and sign-off for date completed should largely suffice for your calibration schedule.

For other maintenance you can use something very similar - perhaps just replace the calibration tolerance column with a summary of the required maintenance details (e.g. full service / gasket change / re-lube / replace bearings etc etc as applicable).

1 Thank

Hi pHruit!

 

Thanks for replying. I get your point and is well noted. In PMS, do I need to create a procedure manual that states how to do it? For example, procedure in die cleaning (PMS sched), how to repair a damaged gearbox, other machine malfunctions and how to repair it, etc?

 

Regards,

Jayson

Off the top of my head, with a standard FSP you should have:

  • A policy/procedure document explaining your PM, Repair program with responsibilities listed
  • a documented PM schedule
  • instructions on the PM's and repairs
    • These could be as simple as a machine manufacturers service book, if it has this information in it
  • Training documents verifying the responsible employees can perform their duties to your standards

 

These don't need to be all on the same document. Depending on which standard you are under (or regulation, if your country has something similar to the USA's PSM), there may be additional boxes you need to tick that go above and beyond these basics.

1 Thank

Well noted! Thank you very much for all your suggestions!  :spoton:


Similar Discussion Topics
HACCP plan for cold smoked trout needed Food safety culture plan fssc22000 v6 HACCP Meeting checklist HACCP plan for chocolate and risk area decision tree HACCP Plan for Frozen Meat Temperature a CCP - Ready to eat plant (Reference document for setting oven calibration frequency) New Equipment and Commissioning Checklist Template HACCP certification for SQG Ed 9.0 - System Element 2.1.1.5 HACCP Training for Flexible Packaging Industry Example of a risk assessment template