Do Walk-In Coolers Need an 18-Inch Clearance Around Walls?

Started by , Mar 31 2025 12:32 PM
3 Replies

Would a walk in cooler require the 18 inch clearance around the walls? when the racking is high enough to allow cleaning of the floors and walls?

 

SQF Element 11.6.2 Cold Storage, doesn't specify.

11.6.2.1 The site shall provide confirmation of the effective operational performance of freezing, chilling, and cold storage facilities. Chillers, blast freezers, and cold storage rooms shall be designed and constructed to allow for the hygienic and efficient refrigeration of food and be easily accessible for inspection and cleaning.

 

Thank for the help.

Share this Topic
Topics you might be interested in
Doors and walls cleaning SOP wall clearance Is PVC walls with colorful printout on them suitable for raw materials storage? Line Clearance Alternatives to Clear Adhesive tape for walls in production area
[Ad]

No the 18" does not apply 

HOWEVER as the standard states, your sanitation plan for the cooler needs to be clear about frequency and inspection for sanitation activities related to the cooler

There is no 18" requirement for refrigeration systems, just ensure you have the needed space to clean.

No the 18" does not apply 

HOWEVER as the standard states, your sanitation plan for the cooler needs to be clear about frequency and inspection for sanitation activities related to the cooler

 

There is no 18" requirement for refrigeration systems, just ensure you have the needed space to clean.

 

 

Thought so but wanted to be sure, Thank you!


Similar Discussion Topics
Doors and walls cleaning SOP wall clearance Is PVC walls with colorful printout on them suitable for raw materials storage? Line Clearance Alternatives to Clear Adhesive tape for walls in production area Formation of ice and snow on the walls and ceiling Hygiene clearance checklist? Is a line clearance form for all maintenance work required? Line Clearance procedure during maintenance works First off and Clearance Line