Jump to content

  • Quick Navigation
Photo

Getting ready for Cert Audit, been thrown a curve ball...

Share this

  • You cannot start a new topic
  • Please log in to reply
8 replies to this topic
- - - - -

acarver

    Grade - AIFSQN

  • IFSQN Associate
  • 41 posts
  • 5 thanks
4
Neutral

  • United States
    United States
  • Gender:Female
  • Location:Georgia

Posted 14 September 2022 - 10:14 PM

I have been working diligently to get ready for our certification audit next month...I can see the light at the end of the tunnel (with the knowledge that the tunnel never really ends!) 

 

Anyway, one of the things I have done consistently in my policies, when appropriate, is direct to another policy that is necessary to complete a task. For example, if I were to have glass breakage, in that policy I refer my hold, release, destruction policy. I am being told that this practice is not acceptable and that I need to write into the glass breakage policy the hold, release, destruction policy.

 

This seems like extreme redundancy to me, especially in some cases...and could become a real headache when one needs to update a policy that is located within several other policies.

 

Does anyone else have thoughts or experience with this?



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5666 thanks
1,546
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 14 September 2022 - 11:24 PM

I have been working diligently to get ready for our certification audit next month...I can see the light at the end of the tunnel (with the knowledge that the tunnel never really ends!) 

 

Anyway, one of the things I have done consistently in my policies, when appropriate, is direct to another policy that is necessary to complete a task. For example, if I were to have glass breakage, in that policy I refer my hold, release, destruction policy. I am being told that this practice is not acceptable and that I need to write into the glass breakage policy the hold, release, destruction policy.

 

This seems like extreme redundancy to me, especially in some cases...and could become a real headache when one needs to update a policy that is located within several other policies.

 

Does anyone else have thoughts or experience with this?

Hi acarver,

 

Which SQF Clause(s) are involved ?

 

There is possibly some confusion between Policy and Procedure.


Kind Regards,

 

Charles.C


OrRedFood

    Grade - MIFSQN

  • IFSQN Member
  • 113 posts
  • 24 thanks
30
Excellent

  • United States
    United States

Posted 14 September 2022 - 11:54 PM

I agree with Charles - I have many policies and programs which need an SOP (procedure) to carry them out. 

 

I will often put a hyperlink to the SOP, which is a separate, "how to" document, in the policy.   This makes it easy to update both at the same time if necessary, and easy to show the auditor without searching around, since they are linked together.  



SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 4,685 posts
  • 1146 thanks
1,135
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Just when I thought I was out - They pulled me back in!!!

Posted 15 September 2022 - 01:21 AM

Nothing wrong with the refference to another or multiple docs as long as you have them right behind the key doc or readily available. Not sure who is telling you that was wrong, it is not.


All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

Glenn Oster Consulting, LLC -

SQF System Development | Internal Auditor Training | eConsultant

Martha's Vineyard Island, MA - Restored Republic

http://www.GCEMVI.XYZ

http://www.GlennOster.com

 


Scotty_SQF

    Grade - SIFSQN

  • IFSQN Senior
  • 380 posts
  • 90 thanks
148
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:hiking, gravel biking, exploring the great outdoors

Posted 15 September 2022 - 11:38 AM

Agree with SQFconsultant on this one.  I have my SOP's set up similar to what you are saying and haven't had any issues.  Just know where they are to be able to provide quickly if the auditor wishes to reference them.



Scampi

    Fellow

  • IFSQN Fellow
  • 5,521 posts
  • 1517 thanks
1,566
Excellent

  • Canada
    Canada
  • Gender:Not Telling

Posted 15 September 2022 - 12:12 PM

Agree with SQF consultant as well

 

However told you that is wrong

 

Just need to ensure the reference docs are up to date in the procedure(s)


Please stop referring to me as Sir/sirs


acarver

    Grade - AIFSQN

  • IFSQN Associate
  • 41 posts
  • 5 thanks
4
Neutral

  • United States
    United States
  • Gender:Female
  • Location:Georgia

Posted 15 September 2022 - 02:52 PM

Thank you all. This clarifies my thought process. Yes, Charles, procedures are what I am speaking of...used the wrong term. 



Miss Frankie

    Grade - SIFSQN

  • IFSQN Senior
  • 269 posts
  • 27 thanks
56
Excellent

  • United States
    United States
  • Gender:Female

Posted 15 September 2022 - 02:58 PM

I have all my written procedures in one binder.  All 'working' papers in separate binders.  In the written binder, where the 'working' papers would be, I'll put a note "These documents are found in xxxxxx binder" so I know exactly where to find them.



jfrey123

    Grade - PIFSQN

  • IFSQN Principal
  • 647 posts
  • 183 thanks
317
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Sparks, NV

Posted 15 September 2022 - 09:25 PM

I've never had someone push back on me for referring to different procedures within a program.  Just thinking of my foreign material procedures, all of them reference placing material on non-conforming material on hold per the prescribed hold procedures.  If you detail how to put items on hold in every single policy that might require a hold, that would require a massive library rewrite any time the hold policy changed.





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users