Hello everyone,
I have a question please. in this clause 4.5.1
There shall be a plan of the site which defines:
Posted 07 February 2017 - 05:57 PM
Hello everyone,
I have a question please. in this clause 4.5.1
There shall be a plan of the site which defines:
Posted 07 February 2017 - 06:44 PM
Hello everyone,
I have a question please. in this clause 4.5.1
There shall be a plan of the site which defines:
• access points for personnel• travel routes• staff facilities• process flow• storage areas.We should have one plan of all that or a plan for each item?Thank you
Either is acceptable. It just depends on how confused it looks with everything on there in my opinion and I've never had an issue with either. On one of our factories, it's all on one plan. In another one, they're separate or else you wouldn't be able to work it out.
Posted 08 February 2017 - 06:43 AM
Hi,
This depends on you. We have everything on one plan. But it is not so complicated and everything is visible.
Posted 09 February 2017 - 10:48 AM
It'll be site / process dependant if you have complicated processes it may be easier to have more than one which will then also enable you to have more detail applied per category. We have a relatively small site with multiple processes so have set this out on a number of separate plans
Posted 10 February 2017 - 03:06 PM
will also need to add access points for raw materials including packaging, we were given a NC for not including this on the plan
Posted 12 February 2017 - 09:18 AM
Hello qualitymanager,
Please see an example. It may help. You also add the plumbing, drainage, flow of packaging and etc.
Lay-out Plan_ifsqn.xlsx 43.07KB 698 downloads
regards,
redfox
Thanked by 4 Members:
|
|
Posted 12 February 2017 - 03:07 PM
Hi redfox,
Very neat/attractive. Thank you.
As you say, plumbing lines, etc and things like water sampling points may be added. An engg.-type layout can be useful also.
Kind Regards,
Charles.C
Posted 13 February 2017 - 05:10 AM
Hello everyone,
I have a question please. in this clause 4.5.1
There shall be a plan of the site which defines:
• access points for personnel• travel routes• staff facilities• process flow• storage areas.We should have one plan of all that or a plan for each item?Thank you
Hi qualitymanager,
I was a bit confused by the clause you quoted initially, clause 4.5.1 relates to water quality:
Clearly there is a lot of information required so multiple site plans are not unusual. Having said that as per your post access points for personnel, travel routes, staff facilities, process flow and storage areas can all be one plan plus some of the other items from above. I personally would prefer to have more plans if it makes the information clearer rather than trying to crowd the information into one site map. It is also important to ensure that areas (zones) where product is at different levels of risk from contamination are clearly identified.
Kind regards,
Tony
Celebrating 15 years of IFSQN Implementation Packages:
Practical Internal Auditor Training for Food Operations Webinar - Friday December 06, 2024 - Now available via the webinar recording
Fantastic value at $97/per person, but don’t take our word for it, read the Customer Reviews here
Posted 13 February 2017 - 05:41 AM
Hello Charles,
Yes Charles engineering lay out will do. Plumbing, drainage lay-out and packaging flow must be included and make sure no criss-crossing prevent cross-contact and cross-contamination. What I sent is just an example to qualitymanager for a kickstart.
regards,
redfox
Posted 13 February 2017 - 10:32 AM
Hello qualitymanager,
Please see an example. It may help. You also add the plumbing, drainage, flow of packaging and etc.
regards,
redfox
Hi redfox,
As Charles said the diagram is neat and attractive. A few questions though:
Is there a colour coding scheme?
There is a cooking room, where is the flow of the cooked product?
There appears to be two buildings, is there a transfer of personnel and products between buildings? and do staff get changed then go outside to access the other building?
Kind regards,
Tony
Celebrating 15 years of IFSQN Implementation Packages:
Practical Internal Auditor Training for Food Operations Webinar - Friday December 06, 2024 - Now available via the webinar recording
Fantastic value at $97/per person, but don’t take our word for it, read the Customer Reviews here
Posted 13 February 2017 - 01:42 PM
Hello Tony,
The worker on the cooking area can not enter into the processing area. On the main building, the receiving personnel, packing and canister washing personnel has different entrance from the picking and sorting personnel. The green arrow is the flow of the raw material. Actually cooked crab is still consider on this process as raw material. This is the flow of our pre-processing plant. The finished product of this pre-processing plant is picked crab meat, which will be canned and pasteurized in our main plant.
regards,
redfox