Dear colleagues,
In IFS in the chapter considering traceability it says: Where goods are labelled at a later time, the temporarily stored goods shall have been provided with a specific lot labelling. The shelf life (e.g. best before date) of the labelled goods shall be calculated from the original production batch.
Does this mean that the shelf life date has to be defined based on the date which rework would get? Or do I mix something now, has this anything to do with rework and adding rework in an another batch?
Thank you so much in advance!
Viivi