Is scheduling a future date for an Internal Audit of a program an acceptable response for an NC?

Recall and Withdrawal

  • You cannot start a new topic
  • Please log in to reply
3 replies to this topic

#1 Lisa_MG

Lisa_MG

    Grade - Active

  • IFSQN Associate
  • 19 posts
  • 1 thanks
1
Neutral

  • United States
    United States

Posted 19 March 2020 - 08:41 AM

Is scheduling a future date for an Internal Audit of a program an acceptable response for a NC? We have a NC for 3.11.2 for not having conducted a test on our Recall and Withdrawal system.  Our staff is out, partly due to slow season and partly due to recent state of emergency requirements due to the coronavirus.  I have scheduled this for future review (April 2020). I am including an audit schedule in my response.  Do you feel this will be acceptable or will I need to conduct the review now?

 

Many Thanks!


Edited by Lisa_MG, 19 March 2020 - 08:43 AM.


#2 pHruit

pHruit

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,057 posts
  • 473 thanks
223
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Interests:Composing/listening to classical music, electronics, mountain biking, science, sarcasm

Posted 19 March 2020 - 09:39 AM

I don't think the response is unreasonable given the circumstances, but to an extent you'll be at the mercy of the auditor's sense of pragmatism - there would be a legitimate argument that if an actual emergency arose then you would need to be able to run the recall system now/today/immediately.



#3 SQFconsultant

SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 2,449 posts
  • 649 thanks
497
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Seeker of truth, T/O, microgreens, making moots cheese, light jazz and being in love.

Posted 19 March 2020 - 03:37 PM

Is scheduling a future date for an Internal Audit of a program an acceptable response for a NC? We have a NC for 3.11.2 for not having conducted a test on our Recall and Withdrawal system.  Our staff is out, partly due to slow season and partly due to recent state of emergency requirements due to the coronavirus.  I have scheduled this for future review (April 2020). I am including an audit schedule in my response.  Do you feel this will be acceptable or will I need to conduct the review now?

 

Many Thanks!

 

I understand the circumstances, however as a former SQF Auditor I doubt a future date will not be acceptable to the Auditor or reviewer.

I suggest conducting the review now and sending in your successful test documentation now.


Warm regards,

 

 

Glenn Oster

 

 

Glenn Oster Consulting, LLC / 800.793.7042 / USA, Centro & South America

SQF System Development, Implementation & Certification Consultants

Food & Food Storage/Logistics // eConsultant // Internal Auditor Training

www.GlennOsterConsulting.com

 

 

Do it in 3 Steps on the 3rd to the 6th for $33.00...
 

#4 Lisa_MG

Lisa_MG

    Grade - Active

  • IFSQN Associate
  • 19 posts
  • 1 thanks
1
Neutral

  • United States
    United States

Posted 19 March 2020 - 11:57 PM

Thank you so much for your advice, much appreciated.  I will conduct the review