Hi
I wonder if anybody could shed some light on the requirements for Declaration of Compliance in raw materials. I'm preparing for an upcoming BRC audit and thought I would ensure I had all raw material DOC's. I have always been of the opinion that the DOC needed to be dated within the past 12 months. But I thought I would check it out in the regs 1935/2004 & 10/2011 as well as the BRC standard. I couldn't find anything that said the DoC needed re-issuing other than following a change. Am I ok to go into the audit with DoC's some of them dating back to 2018.
thanks
Mark