Jump to content

  • Quick Navigation
Photo

Need help with Building Structure

Share this

  • You cannot start a new topic
  • Please log in to reply
1 reply to this topic
- - - - -

kasie_marie

    Grade - Active

  • IFSQN Active
  • 4 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 16 December 2020 - 09:55 PM

The company I am at is working towards a GMP certification. We currently are having an issue within our dish room. It is located away from production. It is a room within a larger room that has an exterior door and a door leading into where we store packaging materials. We pressure wash racks in this room and at the moment it is hard to continuously be cleaning because the pressure washer causes a mist buildup in the room. The plant manager is considering removal of the ceiling within the dish room to help with circulation. Does anyone have any insight if this even possible to do? 


  • 0

SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 5,109 posts
  • 1229 thanks
1,267
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Home now on Martha's Vineyard Island/Republic of these United States

Posted 16 December 2020 - 10:53 PM

The room should have a HVAC with Dryer accessory or build in.


  • 0

All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

 

 

Glenn Oster Consulting, LLC 

Consultants for SQF, ISO-certified payment systems, Non-GMO, BRC, IFS, Lodging, F&B

http://www.GlennOster.com  -- 774.563.6161

 

 

 

 

 

 

 

 




Share this

1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users