Hello Everyone,
Hope everyone is doing great.
I have received a NC on my last BRC audit for clause 2.5.1 The audit wrote this in the report: The manufacturing diagram does not indicate the reception stage of raw ingredient received frozen at (-18º) .
To be more clear in my process flow diagram, I have step 1 saying <Raw Material Reception (Frozen -18 ° C). >
The box bolow says step 2 <Storage and Inspection of Raw material>.
So I receive a NC because in that box I not write -18°C.
Easy fix I just added the -18°C in box #2. My process controls were already in place. It was just the -18°C that was missing.
What would you suggest for the root cause and Proposed preventive action plan be for this !!
Best Regards,
Love this Forum