Hi all,
Looking for a little guidance.
A client is looking at sites and one has a production facility with existing toilets around the internal perimeter of the production area. The toilets open directly into walkways in production.
My understanding is that no toilets should open directly into production but they wondered if we added another door in between the "production area" door and the toilet and ensured one was closed before the other opened, would that satisfy the requirement? They were also considering building waist height partitions along each walkway.
Your thoughts would be much appreciated
Many thanks