Hi All,
I would like to seek your advice regarding our plan to reduce our OPRP monitoring frequency from every 2 hours to once every shift.
Do you have any idea what are the possible documentations that will be checked/ required by the auditor?
Background & details:
Industry: Food Packaging- glass containers
OPRP: Inspection machines
Significant FS hazard: glass splinters
Action criteria: Maintain shaft position and timing (Highest position 105°, lowest position 285°) and Detection and ejection of all test sample bottles
For the past 10 years, we have no OPRP failure recorded.