Best Answer , 23 May 2023 - 06:28 PM

Agree with Charles

 

A traditional HACCP CCP requires you to have performed a validation study PRIOR to rolling out the CCP-------what does it say your supposed to do?  This is again a problem with GFSI's ---the basics are being missed/not completed

 

 

Also===for most places, the CA would be to 

 

1. Stop Production

2. Place ALL product since last good check on HOLD

3. Maintenance to evaluate MD (or whoever knows how to adjust/test it)

4. Verify all test pieces are being kicked out (about 20 times/piece)

5. Perform any other inspections (other equipment for missing pieces)

6. Resume production

 

1. Rerun ALL product on HOLD through the MD one at a time--if all are rejected-dispose of the entire lot

2. If only a select few are rejected Open packages to find the MD

3. Release good product based on your CCP (form 10) if it meets your requirements


  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic
- - - - -

Touchdown

    Grade - Active

  • IFSQN Active
  • 16 posts
  • 0 thanks
1
Neutral

  • United States
    United States

Posted 23 May 2023 - 04:47 PM

We have a metal detector which is one of our CCPs

 

Ours Critical Limits is 2.00mm Ferrous; 2.00mm Non-Ferrous; and 2.00mm Stainless Steel. 

 

We test drops balls every hour for 1.00mm Ferrous, 1.2mm Non-Ferrous, 1.5mm Stainless Steel. 

 

if the smaller balls fail our correct action is to drop the larger balls. 2.00mm balls for each. 

 

Does anyone have any other ideas. 



FSQA

    Grade - SIFSQN

  • IFSQN Senior
  • 315 posts
  • 126 thanks
55
Excellent

  • United States
    United States

Posted 23 May 2023 - 04:56 PM

You are already "over achieving" your limits per your declared Critical limits.

 

What's the idea behind using smaller balls than your CC? If the equipment is calibrated at these lower limits, why not to move your critical limits to the lower threshold?


  • G M likes this

Touchdown

    Grade - Active

  • IFSQN Active
  • 16 posts
  • 0 thanks
1
Neutral

  • United States
    United States

Posted 23 May 2023 - 05:45 PM

If we move our critical limits to the lower threshold.  What would our Correct Action be?



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5665 thanks
1,546
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 23 May 2023 - 05:46 PM

We have a metal detector which is one of our CCPs

 

Ours Critical Limits is 2.00mm Ferrous; 2.00mm Non-Ferrous; and 2.00mm Stainless Steel. 

 

We test drops balls every hour for 1.00mm Ferrous, 1.2mm Non-Ferrous, 1.5mm Stainless Steel. 

 

if the smaller balls fail our correct action is to drop the larger balls. 2.00mm balls for each. 

 

Does anyone have any other ideas

Hi Touchdown,

 

Assuming "ideas" includes HACCP, do tou have a Validation, Verifcation and Corrective Action ? This should indirectly answer yr Post 3.


Kind Regards,

 

Charles.C


Scampi

    Fellow

  • IFSQN Fellow
  • 5,514 posts
  • 1515 thanks
1,561
Excellent

  • Canada
    Canada
  • Gender:Not Telling

Posted 23 May 2023 - 06:28 PM   Best Answer

Agree with Charles

 

A traditional HACCP CCP requires you to have performed a validation study PRIOR to rolling out the CCP-------what does it say your supposed to do?  This is again a problem with GFSI's ---the basics are being missed/not completed

 

 

Also===for most places, the CA would be to 

 

1. Stop Production

2. Place ALL product since last good check on HOLD

3. Maintenance to evaluate MD (or whoever knows how to adjust/test it)

4. Verify all test pieces are being kicked out (about 20 times/piece)

5. Perform any other inspections (other equipment for missing pieces)

6. Resume production

 

1. Rerun ALL product on HOLD through the MD one at a time--if all are rejected-dispose of the entire lot

2. If only a select few are rejected Open packages to find the MD

3. Release good product based on your CCP (form 10) if it meets your requirements