Jump to content

  • Quick Navigation
Photo

What should be included in a cook validation?

Share this

  • You cannot start a new topic
  • Please log in to reply
2 replies to this topic
- - - - -

Orpheus

    Grade - Active

  • IFSQN Active
  • 4 posts
  • 0 thanks
0
Neutral

  • United Kingdom
    United Kingdom

Posted 08 March 2024 - 06:16 AM

Hi everyone. What should be included in a cook validation. I have been audited and i included product, temperature reached, micro pre and post cook to show removal of pathogens (using UKAS accredited external lab) & photos detailing temperatures reached and an introduction detailing what/why/how to carry out the study. Should i include all cooking vessels if they hold different amounts of product. Anything else i should include? Thanks in advance. 



jay2023

    Grade - MIFSQN

  • IFSQN Member
  • 61 posts
  • 12 thanks
9
Neutral

  • United Kingdom
    United Kingdom

Posted 08 March 2024 - 01:57 PM

Hi, i have attached a validation procedure from a UK meat company that should help as a guide

Attached Files



jay2023

    Grade - MIFSQN

  • IFSQN Member
  • 61 posts
  • 12 thanks
9
Neutral

  • United Kingdom
    United Kingdom

Posted 08 March 2024 - 02:03 PM

Also, it depends on who you are supplying but for example M&S will require each oven/cooking vessel to be validated even if all are identical.

You will definitely need separate validations if there are any differences in the ovens like capacity, heat supply type, or brand of oven/cooker.





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users