Jump to content

  • Quick Navigation
Photo

Are 3 month required documents for SQF Audit?

Share this

  • You cannot start a new topic
  • Please log in to reply
5 replies to this topic
- - - - -

PPPP

    Grade - AIFSQN

  • IFSQN Associate
  • 27 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 12 March 2024 - 09:53 PM

Hi,

We will be starting our production soon. We want to start documenting to be prepared for GFSI audit (SQF audit). What are the required records that we need to keep? Where do I start the record keeping process from?

 



kingstudruler1

    Grade - PIFSQN

  • IFSQN Principal
  • 856 posts
  • 293 thanks
259
Excellent

  • United States
    United States

Posted 13 March 2024 - 03:03 AM

I dont think I ever attempted to put a list like this together.   Its too plant specfic in many ways.  

 

If you search the SQFI standard for "record" you will get a partial list.  Please dont rely on this alone, it falls short of evertything that is needed.  

 

When people read the code/standard, I encourage them to ask themself  "how am I going to prove to an auditor that we meet the particular clause?"  It may be an observation, a policy / procedure, a record,  or a combination of these.   I think this is a better approach than trying to work off of a check list.   It ill also help gain confidence on how you are going to "defend" your program when the day comes.  


  • G M likes this

eb2fee_785dceddab034fa1a30dd80c7e21f1d7~

    Twofishfs@gmail.com

 


SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 4,676 posts
  • 1143 thanks
1,133
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Just when I thought I was out - They pulled me back in!!!

Posted 13 March 2024 - 03:38 AM

3 months is the bare minimum.


All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

Glenn Oster Consulting, LLC -

SQF System Development | Internal Auditor Training | eConsultant

Martha's Vineyard Island, MA - Restored Republic

http://www.GCEMVI.XYZ

http://www.GlennOster.com

 


Scampi

    Fellow

  • IFSQN Fellow
  • 5,514 posts
  • 1515 thanks
1,561
Excellent

  • Canada
    Canada
  • Gender:Not Telling

Posted 13 March 2024 - 01:12 PM

Have you written your Food Safety Plan?  What documents does it list?  That is the BARE MINIMUM you'll need to have

 

Supplier Approval Program?

 

Pest Control Plan and inspection reports
 

Water sampling?

 

Titrations for sanitation

 

The list is endless


Please stop referring to me as Sir/sirs


Setanta

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,611 posts
  • 371 thanks
390
Excellent

  • United States
    United States
  • Gender:Female
  • Interests:Reading: historical fiction, fantasy, Sci-Fi
    Movies
    Gardening
    Birding

Posted 13 March 2024 - 02:26 PM

Sanitation SOP

Net Weight Policy

Lot Tracking

Pest Control Program

GMP Training

Glass Program

Temperature Control Monitoring

Allergen Program

Vehicle Inspection and Temperature Monitoring/Truck seal

Environmental Testing

FIFO Policy

Glove Policy

Pre-Operation Swabbing Policy

Raw Material Verification Policy

Rework Policy

Vendor Approval Policy

Back Flow monitoring

Master Sanitation cleaning process

Color Coding Policy

Customer Complaint Policy

Document Retention

Managerial Responsibilities Policy

Recall Program

Scale Calibration


-Setanta         

 

 

 


jfrey123

    Grade - PIFSQN

  • IFSQN Principal
  • 636 posts
  • 182 thanks
314
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Sparks, NV

Posted 13 March 2024 - 04:18 PM

Good lists above, but as stated the records you need will be plant specific depending on your programs.  The "Say what you do; Do what you say" mantra is legitimate, explicitly so in record keeping.  If you write an SOP that states "We check this thing every 2 hours," you'd better have forms or a log from every day showing that it was checked every 2 hours.  If your SOP states "we perform this task weekly," better have a record of it.

 

You'll want to start the record keeping for production the day you start producing.  For the sanitation of your plant prior to that production date, start documenting all your cleanings now.  Same with whatever you've decided for internal auditing of the facility and your programs.  With only 3 months of active production to sort through, I'd expect your auditor to breeze through that and have time to look closer at things like supplier approval documents, management reviews, all of the back end work you've done to establish your SOP's and some review of how they've been performing in those first months of start-up.





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users