Hello,
We are reviewing our maintenance release procedure and i'm wondering if there is some specifics attention that we should pay for the équipement that are considered as a CCP.
There is some verification or approval to be done?
We check cleaning, absence of dirts/foreign bodies but for a CCP should we check something else?
Our CCPs are Silos and metal detector!
Thank you