Jump to content

  • Quick Navigation
Photo

Raw Material Risk Assessment

Share this

  • You cannot start a new topic
  • Please log in to reply
4 replies to this topic
- - - - -

Dom

    Grade - Active

  • IFSQN Active
  • 3 posts
  • 0 thanks
0
Neutral

  • South Africa
    South Africa

Posted 15 March 2011 - 10:57 AM

Hi

Can any help out with a Raw Material Risk Assessment Template?

Thanks



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5665 thanks
1,545
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 15 March 2011 - 06:02 PM

Dear Dom,

Welcome to the forum ! :welcome:

Are you processing mangos or beef ?? :whistle:

Yr question may be product/process specific.

Rgds / Charles.C


Kind Regards,

 

Charles.C


Dom

    Grade - Active

  • IFSQN Active
  • 3 posts
  • 0 thanks
0
Neutral

  • South Africa
    South Africa

Posted 16 March 2011 - 08:54 AM

Dear Dom,

Welcome to the forum ! :welcome:

Are you processing mangos or beef ?? :whistle:

Yr question may be product/process specific.

Rgds / Charles.C


Hi Charles

Thanks for your response.

We are a beverage manufacturing plant and have been asked to do a Risk Assessment on each of our raw materials and we are unsure of exactly how to go about this. Any help would be appreciated.

Rgds Dom


konmar

    Grade - Active

  • IFSQN Associate
  • 14 posts
  • 7 thanks
1
Neutral

  • Greece
    Greece
  • Gender:Female

Posted 16 March 2011 - 11:52 AM

Hi Charles

Thanks for your response.

We are a beverage manufacturing plant and have been asked to do a Risk Assessment on each of our raw materials and we are unsure of exactly how to go about this. Any help would be appreciated.

Rgds Dom


Hi, for a Risk Assessment you have to record every risk (microbiological, chemical and physical) for every raw material par example:

Water: microbiological risks : Echerichia coli ect, Chemical risks: Heavy metals etc, Physical risks: it depens from the source of the water
Sugar: microbiological risks : moulds / yeast, Chemical risks: pesticides, heavy metals etc, Physical risks: stones etc


So like that you have to write down everything, the difficult part is when you have to set limits ex: risk Staphylococcus aureus > 100 cfu/gr

Hope I helped a little


Thanked by 1 Member:

Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5665 thanks
1,545
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 16 March 2011 - 01:14 PM

Dear Dom,

As you can see from the previous post, in the absolute sense, there is overlap with the purchase specification of the input raw materials. Assuming you are referring to a safety risk, the analogy would be narrowed to the safety-related criteria as opposed to the "pure" quality characteristics.

However in a HACCP plan sense, the interpretation is extended to what appropriate control measure is available to handle a significant risk, if any.

As I intimated, if you need more specific input, may be necessary to define yr materials / usage. :smile:

Or are you interested in things like risk matrices as particularly utilised in HACCP.? Many threads here on this topic.

Rgds / Charles.C


Kind Regards,

 