Hi Sharon,
Not expert on BRC6 however -
3.9.2 seems to be traceability, full traceability (whatever that means) required in 4 hrs.
3.11.3 relates to testing recall. Annual (minimum) test (presumably "mock recall") required. no time mentioned.
So maybe the quest continues.
It is also possible the OP includes some confusion over terminologies if USA was involved at all since "full traceability' is mentioned/overviewed by AIB with 24 hrs limit (due new plant rules). Other more demanding targets mentioned also (2hr) predictably different to BRC6.
AIB traceability, mock recall terminologies-implementation - 8Recall.pdf 287.52KB
312 downloads
AIB - TraceandRecall methods.pdf 110.97KB
296 downloadsPS - my experience UK retailers /
mock recall similar to your time but can get complicated if shipments out of the country of origin involved - disturbing people watching the telly for a mock recall can generate some heat.
Rgds / Charles.C
As per related thread below, there are a range of opinions on the exact interpretation of traceability, mock recall, degree of overlap, etc. For current thread, the OP's actual requirements / standard, if any, remain unknown (BRC's expectations for MR are also rather opaque, eg "in a way that ensures their effective operation"

).
http://www.ifsqn.com...dpost__p__48267