Posted 24 December 2013 - 06:43 AM

Hello,

 

We have one syrup production line and we sterilize & clean our syrup production and filling line by using hot water(100 0C) for 30 sec since we are approaching for ISO 22000 implementation I would like to know that CIP using 3 or 5 step is essential or what we are doing is sufficient.

 

we have carried out microbial analysis of our products and TPC, COLI, YEAST AND MOLD are at minimum level. Please guide me.

 

Thanks and Regards,

 



SUSHIL

    Grade - MIFSQN

  • IFSQN Member
  • 162 posts
  • 225 thanks
19
Good

  • India
    India

Posted 26 December 2013 - 05:37 AM

please visit the following posts-

http://www.ifsqn.com...for-validation/

http://www.ifsqn.com...-manufacturing/

and other posts on cip in this forum



saqibfst

    Grade - MIFSQN

  • IFSQN Member
  • 58 posts
  • 10 thanks
0
Neutral

  • Pakistan
    Pakistan

Posted 26 December 2013 - 08:11 AM

The success in cleaning any vessel or pipeline circuit in place depends on five considerations; time , temperature, pressure, concentration and hydraulics. increasing temperature may decrease the time required to CIP but the excessive temperature cause expansion which can eventually cause crack in the welds and seams of such a vessels.

 

you are doing with simple hot water. how much its effective, the microbial result will show. to make sure the best result will come after post rinsing .

A good CIP system includes Pre and post rinse cycles. the type of product used for CIP depends on the soils being cleaned. in the case of heavy soils fatty nature that are burned on or caramelized , a caustic product is indicated. where the soils lighter , and can be removed with a pre-rinse , a milder alkaline product is adequate. when proteins are involved , chlorine must be incorporated in the wash cycle to peptize these proteins.

In every case, the alkaline wash cycle should be followed with an acid post rinse. The post rinse solution should be at a pH level so that the residual left on the surface of the vessel or in the pipeline is approximately 4.5 to 5.  the acid solution should remain in the pipeline until preparing for production.

 

regards

saqib