Dear all,
I am operating a water bottling facility which produces approximately 7000 bottles per hour (500ml).
Our source of water is from the municipality so it's already chlorinated and it's chemical composition is according to regulations.
We have reservoir tanks that hold up to 150, 000 litres. Inside the facility we have sand filter, carbon filter , sodium ion exchanger, micro filter, RO machine 1st stage, UV machine, Ozone generator and then finished product tank.
Our factory does the blowing of PET preforms and the move into the conveyor directly into the washing, filling and capping machine.the filled up bottles then pass in front of an inspection area to inspect for any defects before passing through a UV tunnel then to the expiry machine before going to the labelling machine then the shrink machine.
Please help me out with the way of creating and validating a correct HACCP PLAN.
Thanks in advance.
Regards,
Gulf
- Home
- Sponsors
- Forums
- Members ˅
- Resources ˅
- Files
- FAQ ˅
- Jobs
-
Webinars ˅
- Upcoming Food Safety Fridays
- Upcoming Hot Topics from Sponsors
- Recorded Food Safety Fridays
- Recorded Food Safety Essentials
- Recorded Hot Topics from Sponsors
- Food Safety Live 2013
- Food Safety Live 2014
- Food Safety Live 2015
- Food Safety Live 2016
- Food Safety Live 2017
- Food Safety Live 2018
- Food Safety Live 2019
- Food Safety Live 2020
- Food Safety Live 2021
- Training ˅
- Links
- Store ˅
- More