I don't post very much but have learned much from reading topics posted here.
My question is I'm having a little difficulty answering a NC from my BRC audit in June. The NC was clause 5.6.1.1. I wonder if I'm overthinking this or not thinking logically.
I had no risk assessment for finished product / environmental monitoring.
I work at a bottled water plant very low risk. I have the methods and specification limit for testing outlined in the QC procedures.
I don't have a frequency assigned as our CCP is ozonation and monitoring times are indicated, all other testing is conducted when the ozone is checked in the lab. I'm hung on the risk assessment required at this clause - should I do a risk assessment for the microbiological, chemical, physical and organoleptic?
Any help would be appreciated. I did a search for this clause in the forum but 1 link is missing and the other 2 were not on page listed.
thanks again.