Morning all,
one of the grieve we have here on site is that the job cards for the reported breakdowns are not signed off and people give excuses that they don't have time to find relevant people to sign these.
Usually, a breakdown job card is printed after the job has been fixed and then it will wait until someone from engineering finds time to take the supervisor signs on it.
we use workmate to assign and print job cards but this is done after the event has happened.
I would like to use the PC on the shop floor so engineers can issue their own job cards as and when and digitally take signatures on them, would this be acceptable for BRC?
What would you guys suggest?
Thanks