Hi,
I have bee asked to carry out a risk assessment for this particular scenario. I am dealing with such scenario for the first time so I was wondering if you guys can advise on this please?
We have hired a contractor who are planning to spray paint the ceiling above the production lines and Senior Management has said that production should go ahead and lines shouldn't be stopped.
So contractors have came up with a plan to cover each production line by a thick sheet of polyethylene film suspended in the air right above it. Having said that we do have food grade packaging
What factors would you take into consideration whilst doing a risk assessment and would you do it on a standard template?
I have already asked for these:
- MSDS
- SOP
Appreciate your time to read and reply to this.
Many Thanks