Jump to content

  • Quick Navigation
Photo

How long do you allow production equipment to sit before starting back up or deciding to fully clean?

Share this

  • You cannot start a new topic
  • Please log in to reply
7 replies to this topic

LivingHealthy86

    Grade - AIFSQN

  • IFSQN Associate
  • 32 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 08 June 2020 - 12:57 PM

How much time do you allow for production equipment to sit before starting back up or deciding to fully clean? 



olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,360 posts
  • 438 thanks
432
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 08 June 2020 - 01:09 PM

Why should it sit? We clean the equipment right away after being used (packing line, pump) or emptied (e.g. pasteurization vat, blend tank) - otherwise, the longer the equipment sits unclean, the more possibility that milk protein is hardened somewhere inside and consequently will be more difficult to remove. Anyways, it depends on your processes and equipment involved.



zanorias

    Grade - PIFSQN

  • IFSQN Principal
  • 811 posts
  • 245 thanks
167
Excellent

  • Wales
    Wales
  • Gender:Male
  • Location:UK
  • Interests:Motorcycling, Food Safety, Science, Paddleboarding, Space

Posted 08 June 2020 - 02:03 PM

May need some more info to understand what you mean. What exactly is it doing while "sitting" - after used in production? between products? What is the purpose for this equipment sitting?



SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 4,614 posts
  • 1133 thanks
1,118
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Just when I thought I was out - They pulled me back in!!!

Posted 08 June 2020 - 04:34 PM

Equipment is fully cleaned after use.

 

However, if you mean equipment that is place in temporary storage to be used later on - couple of days, couple weeks, etc - it gets placed into a storage area fully cleaned and checked every other day (dust, settlement, pests, etc.) and recleaned again prior to being placed back into service.


All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

Private CONSULTANT

(Food, Emerging Financials & Supplements)

ceo - Goodstart Coastal Enterprises, LLC

 

United States of the Republic

http://www.GCEMVI.XYZ

 

774.563.7048


Timwoodbag

    Grade - MIFSQN

  • IFSQN Member
  • 210 posts
  • 68 thanks
33
Excellent

  • United States
    United States
  • Gender:Male

Posted 08 June 2020 - 09:49 PM

You have to decide how long it is safe for equipment to sit unused based on storage conditions, type of product, amount of time since last use, etc.  Instead of trying to prove all that is effective though just clean the equipment at the end of its last run, and clean again before next use, every time.  

 

Or do you mean like 12 hours overnight vs. 72 hour weekend?  


Edited by Timwoodbag, 08 June 2020 - 09:51 PM.


Jim E.

    Grade - MIFSQN

  • IFSQN Member
  • 166 posts
  • 25 thanks
10
Good

  • Canada
    Canada
  • Gender:Male
  • Location:Alberta, Canada
  • Interests:Sports of course.
    Food safety for all things eaten not just what we make.
    Being able to see my kids grow up in healthy environment.

Posted 09 June 2020 - 08:48 PM

In our facility we will clean and sanitize.  If the line does not restart in 4 hours, mechanical issues, the line will just be re-sanitized.  As for extended down time after a cleanup that will be 2 days or more we will give the line a quick reclean and sanitize before restarting.  But the first cleaning has to be a good one to make this work as the line is inspected before any restart after a cleaning.


Edited by Jim E., 09 June 2020 - 08:49 PM.


QM-OS

    Grade - MIFSQN

  • IFSQN Member
  • 103 posts
  • 40 thanks
15
Good

  • Sweden
    Sweden
  • Gender:Not Telling

Posted 10 June 2020 - 09:41 AM

After the last shift of the day, the production line is thoroughly cleaned (desinfected). When it's done there's only a few hourse before next shift start so no more cleaning/rinising.

We do checks before start up to verify cleanliness.

 

If there is a hold up (for what ever reason) or change of product we only rinse the line with water, no chemicals to avoid cross-contamination.

 

If there's been a longer stand still for several days (for repairs/holiday etc.) we do a thorough clean with desinfection before start of next shift.



VThiruselvi

    Grade - AIFSQN

  • IFSQN Associate
  • 32 posts
  • 2 thanks
0
Neutral

  • Malaysia
    Malaysia

Posted 07 July 2020 - 07:13 AM

After the last shift of the day, the production line is thoroughly cleaned (desinfected). When it's done there's only a few hourse before next shift start so no more cleaning/rinising.

We do checks before start up to verify cleanliness.

 

If there is a hold up (for what ever reason) or change of product we only rinse the line with water, no chemicals to avoid cross-contamination.

 

If there's been a longer stand still for several days (for repairs/holiday etc.) we do a thorough clean with desinfection before start of next shift.

if it only few hours, visual inspection sufficient enough however some of the auditors or challenges where there may arise the question, how to ensure the food contact surface is clean enough? For this, your air monitoring and initial testing could work 





Share this


0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users