I would like to get suggestions on how to reduce the risk of contamination, during construction.

More envirnomental swabs, air sampling



#2 olenazh

olenazh

    Grade - SIFSQN

  • IFSQN Senior
  • 318 posts
  • 78 thanks
43
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 15 July 2020 - 12:22 PM

Depends on what you're producing, size of your facility, areas separation, degree of your product exposure, etc. More details are required:)



#3 pHruit

pHruit

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,375 posts
  • 584 thanks
295
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Interests:Composing/listening to classical music, electronics, mountain biking, science, sarcasm

Posted 15 July 2020 - 12:34 PM

Surely swabs and sampling is about verification, rather than actually reducing the risk?

Exactly how is best to manage it will very much depend on your facilities, what you're doing, where, how much space you have etc.
Generally the preference is likely to be that you don't produce whilst undertaking construction work in the same area, for obvious reasons.

As olenazh suggests, if you can provide some more detail on exactly what you're trying to do then forum members may be able to give some more specific suggestions and advice.



#4 SQFconsultant

SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 3,076 posts
  • 782 thanks
648
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Truth is like a delicious slice of watermelon... you just want more and more!

Posted 15 July 2020 - 04:08 PM

We've been on a number of consults for ground up and construction.  

 

There are most times extensive installations of preventors needed (draping, air suckers, portable particulate cleaners, etc.) so that the need for swabbing is not the main need + you will need to have extensive over-watch of contracted workers if you are in production at same time.


Kind regards,

 

Glenn Oster
 
 
GOC GROUP / +1.800.793.7042 / Food - Food Packaging - Food Storage/DC

SQF, BRC & IFS System Development, Implementation & Certification Consultants

Serving Small-to-Mid-Size Businesses | International Cross-Border C-CUR Acceptance

Internal Auditor Training | eConsultant | SQF, BRC & IFS Pre-Development or Pre-Audit GAP

http://www.GlennOsterConsulting.com  -- 

 

 

URGENT - No more Jonah in the whale...

https://bit.ly/3kBj997

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 

#5 Tcarpenter

Tcarpenter

    Grade - Active

  • IFSQN Associate
  • 6 posts
  • 0 thanks
0
Neutral

  • United States
    United States

Posted 30 July 2020 - 12:31 PM

Here is so additional information

 Plant will be down Thurs-Sun. During the downtime- expand a room adding more panels, addition of a entry way in to expanded area. Cooler add wall divide the room, block off two dock doors with panels. Current roll -up door into production room. Will block off entry way, and relocate entry way to back side of the room.

Recent questions.

Listeria issue when tearing down walls. How do we control micro issues. Plant was built in 1990.

 

During production- the site will continue to build walls in non production areas during production. 

What are some of the risks?