MINOR

From site inspection/ PRP check, it was found that some issue related to the outer structure of the production building. The issue has been issued since April 2021 until January 2022 but these issue has not been taken action.

 

please share documents :crybaby:



olenazh

    Grade - FIFSQN

  • IFSQN Fellow
  • 1,364 posts
  • 441 thanks
434
Excellent

  • Canada
    Canada
  • Gender:Female
  • Location:Toronto
  • Interests:My job, church, reading, gym, horror movies

Posted 23 February 2022 - 01:23 PM

Hi np991988, welcome to the forum! So, you've had a minor NC which has not been addressed for an almost a year, right? And in January 2022 it was fixed, correct? Now, what documents you want us to share? Please, be more specific.



np881988

    Grade - Active

  • IFSQN Active
  • 21 posts
  • 1 thanks
0
Neutral

  • Thailand
    Thailand
  • Gender:Male

Posted 24 February 2022 - 04:10 AM

This issue was issued from April 2021 to January 2022, but has not yet been implemented.

I want the action plan document



Brendan Triplett

    Grade - PIFSQN

  • IFSQN Principal
  • 511 posts
  • 131 thanks
107
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Rugby, Military History, Reading

Posted 24 February 2022 - 11:25 AM

hey np881988,

 

Welcome to the forum.  I have attached a corrective action plan (blank) that I have used in the past.  I am not sure if this is what you are looking for.  Please let me know.  Thanks!

 

Cheers!

Attached Files


Vice President and SQF Practitioner in Pennsylvania
Brendan Triplett


Brendan Triplett

    Grade - PIFSQN

  • IFSQN Principal
  • 511 posts
  • 131 thanks
107
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Rugby, Military History, Reading

Posted 24 February 2022 - 11:28 AM

If you are looking for guidance on how to handle this for your program then you can look at this thread.  A lot of good info:

 

FSSC 22000 V 5.1 Clause 2.5.12 PRP Verification Interpretation - IFSQN

 

Cheers!


Vice President and SQF Practitioner in Pennsylvania
Brendan Triplett


np881988

    Grade - Active

  • IFSQN Active
  • 21 posts
  • 1 thanks
0
Neutral

  • Thailand
    Thailand
  • Gender:Male

Posted 24 February 2022 - 11:38 AM

have sample documents building structure improvement



np881988

    Grade - Active

  • IFSQN Active
  • 21 posts
  • 1 thanks
0
Neutral

  • Thailand
    Thailand
  • Gender:Male

Posted 24 February 2022 - 11:39 AM

Answers must be submitted to close NC within 21 days, but no response guidelines have yet been provided.



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5676 thanks
1,549
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 24 February 2022 - 12:19 PM

Answers must be submitted to close NC within 21 days, but no response guidelines have yet been provided.

Hi np88,

 

Which Standard ? (I guessed BRC8 but BRC8 has no clause 2.5.12).

 

Any relevant response will probably need to demonstrate an intended/scheduled plan for correction. The latter will likely depend on the specific Issue..

Can you clarify what the problem was ?


Kind Regards,

 

Charles.C


np881988

    Grade - Active

  • IFSQN Active
  • 21 posts
  • 1 thanks
0
Neutral

  • Thailand
    Thailand
  • Gender:Male

Posted 24 February 2022 - 01:47 PM

Hi np88,
 
Which Standard ? (I guessed BRC8 but BRC8 has no clause 2.5.12).
 
Any relevant response will probably need to demonstrate an intended/scheduled plan for correction. The latter will likely depend on the specific Issue..
Can you clarify what the problem was ?


standard >>FSSC 22000 V 5.1
Additional Requirement, Clause 2.5.12


np881988

    Grade - Active

  • IFSQN Active
  • 21 posts
  • 1 thanks
0
Neutral

  • Thailand
    Thailand
  • Gender:Male

Posted 24 February 2022 - 01:49 PM

I have a monthly check. but no maintenance plan that represents the period of completion of maintenance
I would like a guideline on how to make a maintenance plan and an AUDITOR answer guide.



np881988

    Grade - Active

  • IFSQN Active
  • 21 posts
  • 1 thanks
0
Neutral

  • Thailand
    Thailand
  • Gender:Male

Posted 03 March 2022 - 04:23 AM

Attached File  unnamed.png   55.39KB   0 downloadsHelp suggest ways to answer the problem. I have a plan but I don't know how to respond.

 

 



Charles.C

    Grade - FIFSQN

  • IFSQN Moderator
  • 20,542 posts
  • 5676 thanks
1,549
Excellent

  • Earth
    Earth
  • Gender:Male
  • Interests:SF
    TV
    Movies

Posted 03 March 2022 - 05:40 AM

Hi np88,

 

Have a look at this thread -

 

https://www.ifsqn.co...on/#entry171930

 

This clause caused a lot of semantic head scratching but (ultimately) appears to be somewhat easily respondable to.

 

Your own situation appears to involve knowing who is actually responsible for what, how and when.

 

So what was the issue ? Large hole in the roof ? No roof at all ? (I have encountered both :smile: )