Jump to content

  • Quick Navigation
Photo

Hazard assessment methodology in food for determining CCP or OPRP?

Share this

  • You cannot start a new topic
  • Please log in to reply
15 replies to this topic
- - - - -

Manoj.Kumar

    Grade - Active

  • IFSQN Active
  • 16 posts
  • 1 thanks
0
Neutral

  • India
    India

Posted 19 October 2023 - 04:23 AM

Where do we get Hazard assessment methodology in food, for determining CCP or OPRP? Decesion tree or 09 questions and all?



MOHAMMED ZAMEERUDDIN

    Grade - SIFSQN

  • IFSQN Senior
  • 276 posts
  • 59 thanks
61
Excellent

  • India
    India
  • Gender:Male
  • Interests:Sharing the Knowledge

Posted 19 October 2023 - 06:46 AM

Refer the document

Attached Files



Thanked by 3 Members:

Manoj.Kumar

    Grade - Active

  • IFSQN Active
  • 16 posts
  • 1 thanks
0
Neutral

  • India
    India

Posted 19 October 2023 - 07:27 AM

Refer the document

Thankyou Sir for this valuable document . May you please share the document/standard which provide that methodology like ISO31000



MOHAMMED ZAMEERUDDIN

    Grade - SIFSQN

  • IFSQN Senior
  • 276 posts
  • 59 thanks
61
Excellent

  • India
    India
  • Gender:Male
  • Interests:Sharing the Knowledge

Posted 19 October 2023 - 09:48 AM

The methodology is based on the standard ISO 22000 clause 8.5.2.4



Thanked by 1 Member:

Manoj.Kumar

    Grade - Active

  • IFSQN Active
  • 16 posts
  • 1 thanks
0
Neutral

  • India
    India

Posted 19 October 2023 - 11:24 AM

Sir Can you Please share the reference of that document 



Geethanjali_Puppala

    Grade - Active

  • IFSQN Active
  • 1 posts
  • 0 thanks
0
Neutral

  • India
    India

Posted 20 October 2023 - 11:13 AM

You may also refer Whitepaper by Safe360- simple to follow and yet meet ISO 22000 requirement " Determining control measures in HACCP".



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 26 November 2023 - 10:21 AM

Refer the document

Hello, Mr. Engineer Thanks for the risk control plan file If possible, you can send the control plan form file, thanks



MOHAMMED ZAMEERUDDIN

    Grade - SIFSQN

  • IFSQN Senior
  • 276 posts
  • 59 thanks
61
Excellent

  • India
    India
  • Gender:Male
  • Interests:Sharing the Knowledge

Posted 27 November 2023 - 04:19 AM

Control Plan form???????? Which form you are seeking?????



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 27 November 2023 - 04:57 AM

Control Plan form???????? Which form you are seeking?????

An example of a risk control plan form according to the FSSC 22000 standard.Identifying and assessing risks and determining control measures.Thanks.



MOHAMMED ZAMEERUDDIN

    Grade - SIFSQN

  • IFSQN Senior
  • 276 posts
  • 59 thanks
61
Excellent

  • India
    India
  • Gender:Male
  • Interests:Sharing the Knowledge

Posted 27 November 2023 - 07:26 AM

An example of a risk control plan form according to the FSSC 22000 standard.Identifying and assessing risks and determining control measures.Thanks.

refer the attachment

Attached Files



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 27 November 2023 - 09:09 AM

refer the attachment


Thanks for the submitted form Engineer John, in standard paragraph 8-5-2-3, before determining control measures, a risk assessment must be done due to the possibility of risk in the final product and the severity of adverse effects on health, but in the form you sent, the assessment of paragraph 8-5-2 1-4-1 has been done, can you give me some advice, thank you



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 27 November 2023 - 11:26 AM

Thanks for the submitted form Engineer John, in standard paragraph 8-5-2-3, before determining control measures, a risk assessment must be done due to the possibility of risk in the final product and the severity of adverse effects on health, but in the form you sent, the assessment of paragraph 8-5-2 1-4-1 has been done, can you give me some advice, thank you

If possible, send a sample of the OPRP-CCP PLAN form, thanks



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 27 November 2023 - 11:27 AM

refer the attachment

If possible, send a sample of the OPRP-CCP PLAN form, thanks



Tony-C

    Grade - FIFSQN

  • IFSQN Fellow
  • 4,233 posts
  • 1293 thanks
611
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Male
  • Location:World
  • Interests:My main interests are sports particularly football, pool, scuba diving, skiing and ten pin bowling.

Posted 28 November 2023 - 03:19 AM

Refer the document

 

Hi MOHAMMED ZAMEERUDDIN,

 

The scoring system in your document is incorrect:

A The Likelihood of failure of the Control Measures functioning

1 Low

2 Medium

3 High

 

A score of 3 for a control measure that is likely to fail is not right, your scoring should be the other way round.

 

Also If Total Score = 1 - 21 than OPRP is incorrect. The lowest scores will be a PRP or requirement to change the control measure/product/step.

 

Kind regards,

 

Tony



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 28 November 2023 - 05:54 AM

Hi MOHAMMED ZAMEERUDDIN,

 

The scoring system in your document is incorrect:

A The Likelihood of failure of the Control Measures functioning

1 Low

2 Medium

3 High

 

A score of 3 for a control measure that is likely to fail is not right, your scoring should be the other way round.

 

Also If Total Score = 1 - 21 than OPRP is incorrect. The lowest scores will be a PRP or requirement to change the control measure/product/step.

 

Kind regards,

 

Tony

 Hi engineer An example of a risk control plan form according to the FSSC 22000 standard.Identifying and assessing risks and determining control measures.Thanks
 



mesut azeri

    Grade - Active

  • IFSQN Active
  • 18 posts
  • 2 thanks
1
Neutral

  • Iran
    Iran

Posted 10 December 2023 - 08:12 AM

Refer the document

Hello, Mr. MOHAMMED ZAMEERUDDIN, in the PROCEDURE FOR HAZARD CONTROL PLAN form, in my opinion, you did not perform a risk assessment according to clause 8-5-2-3 of the ISO-2018-22000 standard, and you directly performed an assessment of control measures. Is my understanding correct?Is the file I posted correct? Thanks

Attached Files





Share this

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users