Hi , our newly setup production area is connected to a changing room. Workers pass through the changing room before entering the production room . However the cols room entrance is located on the other side of the changing room. This means that, at times, workers need to exit production room , and then access the cold room.
All of this is within the same compound. Is this arrangement acceptable?