Dear All,
I request all of you to share the information about the practices followed by your team for the calibration of milk UHT plants. Please cover the below points:-
1.Calibration checks followed during installation periods and certificates of calibration or proof given by the supplier after installation.
2. Validity of Calibration after installation.
3. Calibration requirements of temperature & pressure sensors - What interval for external & internal - and which method is followed for internal calibrations.
4.Also the name of your UHT plant provider (manufacturer details)
If you can also elaborate some more details about the Good maintenance practices of UHT plants or some useful literatures, will be highly thankful.
Regards,
anish
Hi Anish
This will vary from plant to plant but generally you will want to calibrate:
Thermometers measuring holding temperature & checking steam barriers
Pressure gauges on steam and sterile air barriers
Flow meters for product flow through your holding tube (since it is usually fixed).
Calibration should be conducted before commissioning and usually verified every 3 months. As long as the methodology is traceable to international standards it can be conducted internally although I like to have an independent check periodically as well.
Regards,
Tony
Edited by Tony-C, 19 June 2011 - 07:36 AM.
IFSQN Implementation Packages, helping sites achieve food safety certification since 2009:
IFSQN BRC, FSSC 22000, IFS, ISO 22000, SQF (Food, Packaging, Storage & Distribution) Implementation Packages - The Easy Way to Certification
Practical Internal Auditor Training for Food Operations - Live Webinar - Friday June 06, 2025 - Also immediately available via the previous webinar recording. Fantastic value at $97/per person, but don’t take our word for it, read the Customer Reviews here
Practical HACCP Training for Food Safety Teams - Available via the previous webinar recording.