Jump to content

  • Quick Navigation
Photo

Testing Plan Risk Assessment

Share this

  • You cannot start a new topic
  • Please log in to reply
2 replies to this topic

Annguyen

    Grade - Active

  • IFSQN Active
  • 11 posts
  • 0 thanks
0
Neutral

  • Vietnam
    Vietnam

Posted 08 March 2024 - 03:43 AM

The site shall have in place an environmental monitoring programme whose design is based on risk. The programme shall include procedures and documentation that capture the following: 1. sampling protocol, 2. identification of sample locations, 3. frequency of sampling, 4. target organisms, 5. test methods, 6. control limits, 7. a record of results 8. and result evaluation.

 

Action: Please ensure that the testing plan incorporates a comprehensive risk assessment to determine the sampling size, similarly to what was already done regarding the location, severity, and associated risk factors.

Can someone help me?



Annguyen

    Grade - Active

  • IFSQN Active
  • 11 posts
  • 0 thanks
0
Neutral

  • Vietnam
    Vietnam

Posted 08 March 2024 - 03:45 AM

Risk Assessment on how many environmental swabs to take



jay2023

    Grade - MIFSQN

  • IFSQN Member
  • 61 posts
  • 12 thanks
9
Neutral

  • United Kingdom
    United Kingdom

Posted 08 March 2024 - 02:09 PM

This should help- look at chapter 4

Attached Files





Share this


0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users