Greetings,
We are a food bank with a USDA inspected clean room to pack/repack poultry. Most recently, we have received fresh poultry parts in combo bins that are iced down from the poultry slaughter plant. We store the combo bins of poultry in a reefer trailer backed up to a designated dock door for easy access. The runoff from the iced combo bins drains out the holes in the nose of the trailer onto the concrete in the dock yard. We do not have any type of drainage to carry the runoff away. As a food bank, staffing is always at a premium and it takes a lot of labor to daily keep the dock yard hosed down into a storm drain. We have thought about using some sort of a containment system then have it pumped out frequently enough to not cause a sanitation issue. We have an AIB audit coming up and fear this will be an issue during the exterior inspection. Has anyone on the forum had to deal with a similar issue and if so how was it remedied?. TIA.